Search 5,000,000+ questions and answers.

Frequently Asked Questions

Question: Do I need an engineer to review my building plans?

FAQ
ICF construction within seismic zones 3 & 4 (all of California and Northern Nevada) require that an engineer specify the structural elements of the design plan. Proper engineering will ensure that your construction project meets with local code requirements as well as ensuring proper design loads for hurricanes, earthquakes and other natural environmental conditions.
Related Questions

How do I get building plans?

Franchising - Frequently Asked Questions
The Great Canadian Bagel assist in developing the building plans for your location, including any necessary architectural and/or engineering drawings. However this cost of all drawing are part of the original store capital cost.
Related Questions

Model Builder FAQ
Model Builder has 6 building plans that can be used in any chosen scale. There is a trackside shed, service station, railway station, grain shed, 1/2 quonset service garage and an alley garage. You can also import building plans in .wmf format if you have them. You do not need a building plan to start building with Model Builder, just use the Scale Ruler and start building!
Related Questions

Do your plans satisfy California building codes generally or can they be modified?

Frequently Asked House Plans Questions
I am interested in building a pueblo style home, but am looking into building it as a straw bale house. As I understand it, the basic change would be to change the exterior walls to 14" thick with the foundation plan to match, but the interior stays the same.
Related Questions

Where can I get plans for building?

Model Yachting FAQ
The best bet is to contact the class secretary. Some classes restrict what the owner can build themselves. Some classes allow the owner to build to a very specific plan, and others allow any design within the rules. The AMYA has a few sets of plans for sale for some classes. We are trying to dramatically increase this set, and eventually hope to include electronic versions of plans on-line.
Related Questions

How many sets of plans do I need for a building permit and do I get any back?

FAQ's
Fire prevention requires 2 sets of plans, at least one of which must be sealed / signed by a NYS licensed Architect or Engineer. We retain one copy and send one to the Fire Department. The applicant does not receive any back, marked APPROVED, please supply a third set & request their return on the application. There is no fee for our building permits (same is handled by our building division.)
Related Questions

How often have building departments rejected these plans and for what reasons?

Pyramodule FAQ's
Only 2 out of the 84 sets of plans we sold to date (7/30/02) had problems at all, both of which were resolved. One was regarding the building inspector asking our client to submit stress calculations for wind and snow loads, which was done by an engineer licensed in their state (note: these cannot be universally furnished, due to each state requiring their own licensed engineer to submit such calculations.
Related Questions

Do I need an engineer to review my building plans?

Amvic-Pacific FAQ
ICF construction within seismic zones 3 & 4 (all of California and Northern Nevada) require that an engineer specify the structural elements of the design plan. Proper engineering will ensure that your construction project meets with local code requirements as well as ensuring proper design loads for hurricanes, earthquakes and other natural environmental conditions.
Related Questions

Can I get a copy of my building permit plans?

Frequently Asked Questions > District of Coldstream
If you are the owner or have the owner's consent, you can view building permit plans within the Municipal Hall. Please note that the District of Coldstream does not have all building permit plans. It may take a few days to research if we have any plans for your house. Owners should be aware that the District of Coldstream may not have the building plans on file.
Related Questions

Who has to submit building plans?

Paloma Building Projects - The Renovating Guys - East Rand -
Any new building and any alteration that adds on to or changes the structure of an existing building must go to the city's (Planning) Development Management Department for approval. If you redecorate your kitchen, or re plaster your house, you don't need any permission, because you haven't moved any walls around or altered the drainage system. But if you make a change to the structure, for example, add on a carport, or even just move the front door, you do need permission.
Related Questions

Are the Building Plans Full Size?

James Wharram Designs -Home of the self-build Catamaran.
Some parts of the Building Plans are! Generally, the building plans require you to loft (draw) the components onto the plywood. Full instructions on how to do this are supplied, and it is not a difficult task. Some small parts in some plans, usually the more recent TIKI or ETHNIC designs are shown full size and simply have to be traced. Building Plans are available from our online shop.
Related Questions

Can I have a discount on my Building Plans?

James Wharram Designs -Home of the self-build Catamaran.
I am sorry to disappoint you, but we are not able to offer you a discount. Part of the Wharram philosophy is to be able to build a boat as inexpensively as possible. We already take this into account when putting a price on our building plans, so there is no room for further discount. The plans are only a very small percentage cost of the total expense of building. I am sure once you have seen the plans you will appreciate just how many hours of work by our designers go into each drawing.
Related Questions

What are your long-term building plans?

RCCS - FAQs
Two interim modular structures will accommodate our needs for the next three to five years. Following that, we will be building on 15 acres of the Beachmont Farm property, which has been designated for Redeemer Presbyterian Church and Classical Christian School.
Related Questions

Are my development / building plans ready yet?

Silverthorne, Colorado - Frequently Asked Questions - Commun...
To understand this time frame, it's helpful to understand the planning process. Community Development deals with project plan reviews and building plan reviews. Plans for a four-plex residential unit, subdivision, re-subdivision, annexation, rezoning, variance, conditional use, site plan review or commercial project must go through the project review process. Plans must be submitted for Planning Commission and Town Council review.
Related Questions

How do I obtain a copy of my building plans?

Town of Cambridge - Property
If you are the current owner of a property, you are able to request an archival search for building plans relating to the property by completing an Archive Search Form and making a payment. The cost for the retrieval of plans dated prior to 1995 is $49.50 (these plans are held by the City of Perth), plans dated after 1995 is $33.00. Photocopying charges will also apply.
Related Questions

Do you have plans for my historic building?

Rhode Island Internet Historical Preservation & Heritage...
Historic architectural plans are exceptionally rare. We have a limited number of plans, but only for some recent projects that required our review. If you know the architect of the building, we can tell you likely places to look. The largest collections of architectural plans are found in the Graphics Department at the Library of the Rhode Island Historical Society and (for Providence) in the City Archives.
Related Questions

Are there evacuation plans for my building?

Emergency Preparedness : Frequently Asked Questions
Many buildings on the Twin Cities campus have evacuation plans, including all residence halls and most areas of the Academic Health Center. Contact the Department of Emergency Management for information on existing evacuation plans and assistance creating or revising evacuation plans.
Related Questions

What information should be included on building plans?

Questions and Answers
If adding floor area, energy calculations are required (listed mandatory requirements or computer generated calculations).
Related Questions

Can I use the Building System Plans with other buildings?

Earth Sheltered Homes Heat Storage FAQ - Rocky Mountain Rese...
Certainly. Many purchase them specifically so that they can use the PAHS parts with their own designs.
Related Questions

Where do I get the original building plans for my house?

Planning - Glossary of Terms
The Building Permits Division does not retain the original building plans for homes. To verify square footage, you may contact the Assessor's office at (209) 525-6461.
Related Questions

What if my building plans are rejected by the county?

NDI of Maryland Homes - Building Your Dream Home In Maryland
There are times when the county plan reviewer has a specific question for the architect regarding the building plans. They will require that the architect address this issue prior to approving your building permit. If this should happen, fax the reviewer's notes to (443) 782-0425 or bring them to our corporate office and we will address the issue immediately. We will instruct you if we need the actual building plans in order to address the reviewer's questions or requirements.
Related Questions

What are our plans?

HIPAA FAQ's
A HIPAA Steering Committee is assigned to oversee activities that will ensure compliance with HIPAA regulations. Several Task Teams were formed and are presently doing some of the background work to revise or develop policies and procedures where appropriate.
Related Questions

What are your evacuation plans if something leaks from the building?

TNPRC: Regional BioSafety Lab FAQ
The Tulane National Primate Research Center has an emergency response plan currently used for various disasters, including hurricanes, fire, floods and other natural disasters. Evacuation procedures associated with the new RBL have been incorporated into our current emergency response plan. It is worth noting that our existing BSL-3 laboratory remained operational and secure during and after Hurricane Katrina.
Related Questions

I am interested in your shed plans, but wondered if they meet our local building codes?

Frequently Asked Questions
We design structures intended to meet or exceed national building codes. National building codes serve only as a guideline, since each community is responsible for establishing its own requirements. You will have to check with your local authority to see if any modifications may be required for our plans to comply with local codes. When exceptions to local codes do arise, minor changes are usually all that is required.
Related Questions

Q - Do you know of any plans of anyone building a Titanic II, or exact replica of Titanic?

Frequently Asked Questions and the Webmasters thoughts about...
It's basically a joke, looking back over the past 10 years at these companies(?) that have come and gone that claimed to have plans to build or to be building a Titanic replica. The webmaster originally had a list posted here of several articles and websites of organizations making the claim to have full intentions of building a replica, complete with estimated launch dates. In updating links etc. to this site in Jan.
Related Questions

How can I get my building plans reviewed and approved?

City of Austell: Frequently Asked Questions
In order to have your building plans approved, submit five sets of plans to the Community Development Department and allow two to five days for review. All building plans for structures must be approved before you can obtain a building permit.
Related Questions

What are the differences between a Full Plans application and a Building Notice?

Bexley Council - Building Control
No. However, objections may be raised under separate legislation - for example, if your proposal is subject to approval under the Planning Acts. If the proposals affect or are adjacent to a party wall, fence, etc., you may have to serve a Party Wall Notice on your neighbour (see the Party Wall Act page).
Related Questions

Are BGS plans ready for my building department?

BGS barn, garage and shop plans: FAQ
In almost every case. All BGS plans are designed for specific environmental conditions such as wind speed, roof load and seismic zone, which can vary for some localities and states. The specific requirements a plan meets are noted on the top line of each plan's page. If your building department requires engineered plans, and if these conditions meet your location requirements, then the plans are ready for your building department's approval.
Related Questions

Can I make a building larger then the plans are designed for?

Shed Plans in Gable, Barn & Saltbox styles
Yes, sometimes. Because in many cases we don't use the standard truss system and because of local code requirements, we suggest you check with an engineer first. You can make a building longer or shorter without having any effect on the structure or snow load. If you desire to make a building wider then you should check with an engineer.
Related Questions

Got A Question? Ask Our Community!


More Questions >>

© Copyright 2007-2008 QueryCAT
About • Webmasters • Contact