Search 5,000,000+ questions and answers.

Frequently Asked Questions

Why was the pier built?

WebBanner_newSlogan_thin
The concept of a FRF was first proposed in 1963 by Rudolph Savage, Chief of Research Division of the Coastal Engineering Research Center (CERC). The FRF was to have 4 goals. Provide a rigid platform from land, across the dunes, beach, and surf zone out to 6-m (20-ft) water depth from which waves, currents, water levels, and bottom elevations could be measured, especially during severe storms.
Related Questions

My home is built on a pier and beam foundation. How do I provide a shelter in this type of home?

Texas Tech University :: Wind Science and Engineering Resear...
A portion of the flooring and floor structure can be removed to expose the soil below which will allow for the installation of the shelter concrete floor foundation. The inresidence shelter can be constructed on this foundation and extend through the raised flooring system. Should this solution not be suitable, a shelter which doubles as a windowless mud room, study, etc. can be built adjacent to the home similar to the one described above for manufactured homes.
Related Questions

What is PIER?

FAQs | PIER Online Education Agent Training Course EATC
Access to formal qualifications through a suite of competency-based courses at Diploma and Certificates IV, III and II. PIER is evolving every day so keep checking our website to keep informed about these exciting new developments. PIER is a web based portal providing information and training to individuals involved in international education. It consists of a substantial database of resources and news, and the PIER training courses.
Related Questions

When will it be built?

The New Alzheimer's Center - Frequently Asked Questions
We hope to raise gifts and pledges of $4.5 million by the end of 2007 and complete construction in 2008.
Related Questions

Do the pier pilings enter the bedrock?

WebBanner_newSlogan_thin
No. As discussed in the previous question, the bedrock is far to deep beneath the soft sand. The pilings began as one inch thick hollow tubes. They were pounded 40 feet into the sand until they met resistance. They were then filled with cement all the way up. This created a solid platform for the pier to rest on. The pier has been so sturdy that since it was established in 1977 has not moved more than a centimeter.
Related Questions

What are the wires hanging down the side of the pier?

WebBanner_newSlogan_thin
Baylor gauges that measure wave height. They work by running a small voltage down the cables. Where the water shorts the wires, the computer measures this distance as wave height 4 times per second. There are several baylor gauges along the pier, which allows for the tracking of a wave as it approaches the beach.
Related Questions

What is it like to work at the pier?

WebBanner_newSlogan_thin
A high school student once asked that to Field Research Facility Chief Bill Birkemeier through a series of emails. Click here to read a conversation with a marine scientist.
Related Questions

How many people work at the pier?

WebBanner_newSlogan_thin
people make up the permanent staff at FRF. Their fields of expertise are varied but they are versatile. The permanent staff includes oceanographers, computer specialists, and technicians. For individual details click here.
Related Questions

Why is the Pier ReefCam image so red?

Bonaire WebCams - FAQ
We have a magenta color correction filter on the Pier ReefCam to correct for the loss of red light in water, but the filter might be a bit too strong for the shallow depth we ultimately mounted the Pier ReefCam at. Top
Related Questions

Should I form up my pier?

Frequently Asked Basketball Goal Equipment Questions
If you want your pier to look more aesthetically pleasing you can although it does not have any structural benefits. We do recommend building the pier up a little to reduce the amount of running water around the J-bolts. We also recommend having the footing slope away from the bolts to keep water from pooling around them.
Related Questions

Can I place on pier on the Public Access?

Frequently Asked Questions (FAQ's)
The answer is complicated in that state law does not allow for the placement of piers on the access, however, the Town does have a permitting process to allow for the placement of piers on the public access. This is an extremely unique program in all of Wisconsin and is done with the cooperation of the Wisconsin Department of Natural Resources (DNR). Wisconsin Statute 30.133 reads: Prohibition against conveyance of riparian rights.
Related Questions

Why is there a Pier Permit Moratorium?

Frequently Asked Questions (FAQ's)
The Town of Merrimac is most likely the only township in the State of Wisconsin that has a permitting system that allows citizens to place piers on public accesses. A moratorium was set in place after the dissemination of incorrect information to new and/or potential residents. This moratorium was intended to allow the Town Board to consider its options as to the continuation or potential changes to the program.
Related Questions

Do I need a permit to place a pier on my property?

Frequently Asked Questions (FAQ's)
present, the Town does not require a pier permit to place a private pier on private land. the State of Wisconsin has several regulations about pier placement and in some cases require a permit. Citizens should contact the Wisconsin Department of Natural Resources.
Related Questions

How does the Pier Permit Program work?

Frequently Asked Questions (FAQ's)
Presently, no new applications are being accepted due to the moratorium enacted by the Town Board. Prior to the moratorium, the resident who had previously been permitted to place a pier on the access has the first right of application. If that person fails to apply, or is denied for failing to meet the requirements, then the next person on the waiting list would be presented the opportunity to apply for a permit. This process is reviewed annually by the Town Board as required by ordinance.
Related Questions

Why should I buy at the Pier?

The Pier Apartments | Kapiti Coast | Wellington Region | New...
The Pier is the premier apartment complex on the Kapiti Coast and combines low maintenance, superior quality living, privacy and security with the beach location and the numerous entertainment and outdoor activities only Kapiti has to offer. We believe it will be an excellent long term quality investment.
Related Questions

Where can I find my pier code?

Clean Lakes Associates - Frequently Asked Questions about la...
If you received our mailing, your pier code appears above your address on the mailer. If your pier code was not available or you did not receive a mailing from us, you can obtain your pier code from your local municipal office.
Related Questions

Can I park at the pier?

Frequently Asked Questions
Parking is available at the major piers. The exact rates and style of lot vary. You may want to check with www.seaportsinfo.com for valuable information pertaining to these details, as well as the piers.
Related Questions

Can domes be built anywhere?

Frequently Asked Questions
There are no zoning codes that restrict Natural Spaces domes, and our domes exceed all energy codes. You may be restricted on height as some codes have a maximum height of 30' to 35'. Most of our domes are less than 30' high but the code height is measured from the average grade line. It's only when you have a developer who is a builder, and they want you to build their house, they then put restrictions on their lots - "no log homes, no earth homes, no domes, no imagination".
Related Questions

Who built the first Airboat?

Airboat FAQ - Frequently Asked Questions with Answers
Alexander Graham Bell, who carried out many experiments with aircraft and water craft after the success of his telephone, built an airboat in 1905 in Nova Scotia. The craft he and his engineers built was dubbed the "Ugly Duckling". The craft was primarily used to test aircraft engines and props. Some Cajuns in southern Louisiana claim their grandads built airboats using Model T engines and hand crafted props.
Related Questions

When was the Library built?

Frequently Asked Questions (Library of Congress)
After its founding in 1800, the Library was housed in a boarding house and later in the Capitol. Its first permanent building -- now called the Thomas Jefferson Building -- was opened in 1897. The John Adams Building was completed in 1939 and the James Madison Memorial Building in 1980.
Related Questions

What about check-in at the pier?

Frequently Asked Questions ( FAQ )
There have been some concerns about the new time-line for boarding. Here is the official policy that affects U.S. Customs and Border Protection (Department of Homeland Security) has issued a new ruling that goes into effect on February 18, 2008 which mandates that all guests embarking on a cruise from a U.S. port be checked-in and onboard their ship at least one hour prior to the ship's departure.
Related Questions

Can I jump off the pier?

Pismo Beach, CA - Official Site
Except for public agency training and rescue, it is unlawful for any person to dive or jump or in any manner propel themselves from any portion of the city pier at any time. (Ord. 95-05 ? 2 (part), 1995)
Related Questions

miniHome | frequently asked questions
Northlander Industries of Exeter, Ontario, Canada - boldly undertook the challenge to prototype, finance and build the world's greenest mobile dwelling. This was not the usual custom order, but a complete redesign of the entire chassis, structural, envelope, mechanical and electrical systems (not to mention the production process!)- a radical undertaking for a production builder - and one that we hope will reward them for years to come.
Related Questions

EnviroMission Ltd.
Prior to listing on the Australian Stock Exchange a technical review report prepared by Sinclair Knight Merz, one of Australia's leading engineering specialists, independently assessed the Solar Tower's design concepts and construction methods were well proven and it could be built in Australia. A 50kW prototype Solar Tower plant was constructed and successfully operated in Manzanares, Spain, with involvement of the designer Professor J?rg Schlaich, and the Spanish Government in 1982.
Related Questions

Frequently Asked Questions
One end of the aerial tramway would be on Marquam Hill and the other in the North Macadam district. OHSU's current plan is to align the aerial tram on an east-west route and hang the cable and cars about 40 feet over SW Gibbs Street. Gibbs Street is just south of downtown Portland, between the Willamette River and Marquam Hill.
Related Questions

Boat Plans and Yacht Designs -- Chesapeake Marine Design
Construction methods are indicated in the catalog for each boat. Construction techniques used include glue and screw, tack and tape, panel assembly, strip planking, cold molded and plank on frame. Glue and screw construction is assembled on frames and longitudinal members, keel, chines and sheer clamp. Glue and screw construction is similar to tack and tape because epoxy is used in the joints and fiberglass tape is applied to the external exposed edges of the plywood.
Related Questions

Got A Question? Ask Our Community!


More Questions >>

© Copyright 2007-2008 QueryCAT
About • Webmasters • Contact