When will construction of The Silver Strike Lodge begin?

Silver Strike Lodge at Empire Pass
Construction of The Silver Strike Lodge will begin in the spring of 2006. It is anticipated that The Silver Strike Lodge will be ready for occupancy by the spring of 2008.
Related Questions

Where is The Silver Strike Lodge located?

Silver Strike Lodge at Empire Pass
The Silver Strike Lodge is located in the Empire Pass area of Deer Valley, also known as Flagstaff Mountain, at the base of the Silver Strike Express Chairlift. Empire Pass is part of Deer Valley, but has separate access, and will have an identity all its own. High architectural standards and low density will create a residential enclave of the highest order.
Related Questions

Will there be a lobby at The Silver Strike Lodge?

Silver Strike Lodge at Empire Pass
Yes, from the dramatic porte-cochere, one enters a luxurious lobby. A massive fireplace with hearthstone will greet visitors.
Related Questions

How many residences will be available in The Silver Strike Lodge?

Silver Strike Lodge at Empire Pass
There are a total of 33 residences available, offering a combination of two to four bedrooms. Each wonderful floor plan will incorporate dramatic elements, such as archways, beamed ceilings, crown moldings and stone fireplaces. Penthouses will add vaulted ceilings and hand-hewn trusses.
Related Questions

How far is The Silver Strike Lodge from the Salt Lake International Airport?

Silver Strike Lodge at Empire Pass
The Silver Strike Lodge is 45 minutes from the Salt Lake International Airport, most of it an easy drive on Interstate 80.
Related Questions

Is there a closer airport than the Salt Lake International Airport to The Silver Strike Lodge?

Silver Strike Lodge at Empire Pass
Yes, the Heber Airport is located 18 miles from The Silver Strike Lodge and will accommodate large private aircraft.
Related Questions

How far is The Silver Strike Lodge from Park City?

Silver Strike Lodge at Empire Pass
The Silver Strike Lodge falls within the Park City limits, and is approximately five minutes from the dining and shops of downtown Park City.
Related Questions

Will there be a public transportation system servicing The Silver Strike Lodge?

Silver Strike Lodge at Empire Pass
Yes, "Dial-A-Ride" limo service will be complimentary to residents of Empire Pass, including The Silver Strike Lodge. It will take homeowners to their destinations in Deer Valley and the downtown Park City area.
Related Questions

What kind of amenities are available for owners at The Silver Strike Lodge?

Silver Strike Lodge at Empire Pass
The Silver Strike Lodge will be part of the private Empire Pass area of Deer Valley. As such, owners of The Silver Strike Lodge will enjoy complimentary membership to the Talisker Club located in Empire Pass. The Silver Strike Lodge will have its own fitness facility, a ski-side owners' lounge, grotto-style hot tubs, and a ski locker room. Owners will also have access to a guest suite.
Related Questions

What type of Purchase Contract will be used when purchasing a Silver Strike Lodge unit?

Silver Strike Lodge at Empire Pass
The purchase agreement is an Option contract that will transition into a Real Estate Purchase Contract once the property is platted as condominiums. A 10% deposit will be required at the time of the signing of the Option Agreement, with an additional 10% deposit required for a total of 20% upon completion of the due-diligence period.
Related Questions

What's a strike?

FAQ
Strikes are penalties added to a member's record for violating the rules. Members who get out of line usually first get a warning, but with each other violation, one strike will be added to their record: Three strikes invokes a ban. However, strikes are not permanent: as time passes without incident they wear off.
Related Questions

When will construction begin?

Downtown Dadeland - A Village within a Village
Construction activity is well under way. The site is buzzing with heavy equipment & the bustling of construction crews. back to top.
Related Questions

Toll Extension, Foothill-South Expansion | The Toll Roads Fo...
TCA is submitting applications for a number of federal and state approvals that must be obtained before construction may begin. Preliminary design work is underway now. The permit process is expected to take until at least 2010. Construction could begin as early as 2011 and will take three years to complete. Six toll road alternatives and two non-toll road alternatives were analyzed in the draft environmental document, which was circulated for public review in 2004.
Related Questions

Library Faq :: Daviess County Public Library
Construction has begun on the new library. Check out our web link or drive by the new library at 2020 Frederica Street.
Related Questions

Keeping Our Promise to the Next Generation
This depends upon how quickly the financial commitments are made by the friends of Joy. If we reach our goal of $5.5 million by the end of 2005, we hope to break ground in the spring of 2006.
Related Questions

US 33 AMS FAQ
To date, construction funding has not been earmarked for this project. ODOT has made application for funding to the Transportation Review Advisory Council (TRAC) which is an independent body of officials who decide which construction projects across the state of Ohio should be funded in a given year. The TRAC's rating system is criteria-based. (www.dot.state.oh.
Related Questions

UCSD Biomedical Library Addition: FAQ
Construction began in January 2005, and we hope to have the project completed by the end of summer 2006.
Related Questions

Prairie Falcon Parkway Express
The project cannot begin construction until the environmental analysis occurs and the required governmental and public reviews take place as required by Colorado law. This process will take many months, if not years, to complete. Most of the required provisions were put forward in a 2006 Legislative Act (House Bill 1003). To view this bill and the entire approval process, click here.
Related Questions

Hickory Log Creek Dam and Reservoir Project
A lot of work will happen behind the scenes before actual construction on the project begins, such as evaluating the dam site and designing the various structures—the dam, intake and pump station, and a pipeline. During the design and construction phases, the project will undergo review by the City, CCMWA and Georgia Safe Dams, which is a program managed by the state Environmental Protection Division. The schedule also includes time to hire construction companies to build the projects.
Related Questions

Frequently Asked Questions - The Spectrum at Willoughby Poin...
Construction began July 2006. Pilings for building "C" (which will contain 94 units) started to be driven and bulkhead started to be installed on the east portion of the property during this time. In addition, construction will soon begin on the first 9 yacht homes and the marina store. These buildings are slated for completion in the second half of 2008. Each of the mid rise buildings will take approximately 18-24 months to build and will overlap depending on the pace of sales.
Related Questions

Frequently Asked Questions
The design at Skyline Drive includes the addition of a parking lane. In addition, a right turn only lane is being added to Eagle River Loop Road to facilitate the entry of north bound vehicles onto Skyline Drive. Additional turn lanes are not included in the design because they are not necessary to provide an acceptable level of service and they would require right-of-way acquisition and utility relocation.
Related Questions

Frequently Asked Questions - Hyperion Energy Center
Currently our plan is to begin construction in 2009. As with any large-scale facility that requires special permits, the schedule is contingent on obtaining those permits and other requirements in a timely fashion. Hyperon is not seekng any shortcuts on environmental pemitting and is committed to complying with all environmental regulations from the begining of the permitting process. See the project timeline for more information.
Related Questions

When do we begin construction?

R&B F.A.Q.
Construction has already begun. The ground has been graded and drainage and gutter systems put in place. The foundation should be poured during the month of January.
Related Questions

Where do I begin the construction process?

Cisney & O'Donnell - Professional Remodelers and Custom ...
First, you need to decide what does not meet your home needs. Don't concentrate so much on the physical aspects of your home that you are unhappy with, but rather answers like "We're tired of going to the basement to do the laundry" or "We find the kitchen to be cramped come meal time." Collect magazine articles, pictures, and other materials that will help you decide exactly what changes you have in mind.
Related Questions

When do we begin construction and when will it be completed?

Faith Forward - FAQs
We anticipate that we will raise at least $3.6 million from this campaign. Once we raise at least one third of this amount, we will begin construction. It will take about one and a half years to complete construction.
Related Questions

When will road construction begin?

Frequently Asked Questions
This project is currently funded through the final EIS and Record of Decision (ROD), which will include a conceptual design. MDT will have to secure additional funding for the final design and construction. Typically a project of this nature would require 2 years to complete the final design, preparation of the construction plans and acquisition of the right-of-way. Depending on the alternative chosen, construction could take anywhere from 18-36 months after that.
Related Questions

When the construction starts, would it begin at Laurel?

Frequently Asked Questions
Bridges drive the project. Construction usually started at bridges, but it depends on the weather and time of year. At this point, we can't guess where the contractor would start.
Related Questions

When will the first permanent building begin construction?

CCEC - FAQs
The first permanent building will be in the working drawing stage in 2007/2008 and in under construction during 2008/2009. It will be a 40,000-square-foot building. The second and third buildings will be at intervals of two years after that.
Related Questions

When will the roadway construction begin?

FAQ's
Currently, ODOT is funding preliminary engineering work to advance the project. The estimated award date contained in the TIP is December 2007, with construction expected to begin in the state fiscal year (SFY) 2008.
Related Questions

When will construction on the project begin?

FAQ's about Redwood City Recycled Water Project
The South Bayside System Authority (SBSA) is upgrading its recycled water treatment facility to provide recycled water for the City of Redwood City’s Recycled Water Project. Tertiary treated recycled water from the SBSA Treatment Plant will be distributed for use by Redwood City businesses and Home Owners Associations that voluntarily choose to use recycled water for landscape irrigation. The distribution system is still in the design stage.
Related Questions

Got A Question? Ask Our Community!


More Questions >>

© Copyright 2007-2008 QueryCAT
About • Webmasters • Contact