QueryCAT Logo
Search 5,000,000+ questions and answers.

Frequently Asked Questions

Do I need a drainage inspection for an accessory building permit?

bldg_insp_menu.gif
Any accessory building over 150 square feet requires a drainage inspection. Please note that in addition to the permit fee there will also be a drainage inspection fee. For more information on accessory building requirements including fees, Accessory Building Information.

When do I need a drainage permit?

Hancock County Surveyor
You will need a drainage permit in the following situations. First, if a building or septic permit are required. Secondly, for the relocation or improvements of a county tile or other regulated watercourse.,

How big of an accessory building can I build?

City of Rock Island, Illinois - Frequently Asked Questions
The size of structure is approved through the Zoning Division. A one story accessory building may be constructed on a floating concrete slab not exceeding 720 sq ft. and no dimension greater than 30’.

Do I need to get a permit from Mahoning County Building Inspection for my projects?

Frequently Asked Questions - Zoning | Boardman Township
Yes. After a zoning permit is obtained from Boardman Township, a permit is required for the following from the county: We recommend calling Mahoning County Building Inspection for any projects to see if they require a permit)

Do I need a building permit and an inspection for replacing an appliance, such as hot water heater?

Antioch, IL - Planning Zoning and Building Department
If it is an in-kind replacement, a permit is not required. If however, an electrical appliance is being replaced with a natural gas appliance (or vice versa) then a permit is required.

What items do I need onsite when I call for an inspection on my building permit?

New Page 1
An approved set of plans (and revisions), valid permit, permit card, a copy of the recorded Notice of Commencement, and any engineering documents for that job must be on site.

Where can I get a building permit?

Zoning Requirements FAQs - Fairfax County, Virginia
Application for a Building Permit is made at the Department of Public Works and Environmental Services, Permit Application Center at 12055 Government Center Parkway on the 2nd floor. Normally, Building Permit applications require the submission of building construction plans and a plat. The application is then reviewed for compliance with various building code requirements and to ensure that the nature and location of the proposed construction complies with Zoning Ordinance requirements.

How do I receive a building permit or request an inspection?

City of Tullahoma, TN - FAQs
Building, demolition, plumbing, electrical and grading permits may be obtained at City Hall in the Planning & Codes department from 7:30 AM to 4:30 PM, Monday through Friday. All inspections should be requested a minimum of 24 hours before needed by calling 931-455-2282.

Can I get a permit at a Building Inspection District Office?

Welcome to the City of Dallas, Texas - Building Inspection
Yes, if the permit is for re-roofing, foundation repair, or constructing a fence on an interior lot only (not for a corner lot).

How do I request a fire safety inspection for my building permit?

New Page 1
All occupiable structures, except detached one- and two-family dwellings, will need an approved fire safety inspection prior to occupancy. You can request a fire final inspection on your building permit by using PROMPT or our online services. Where the structure contains associated fire permits for items such as fire suppression or fire alarm systems, the respective inspections for each fire permit must be requested concurrently with the fire final inspection.

What are the rules and regulations for a detached accessory building?

Town of Grand Chute > FAQs
No detached accessory building shall occupy any portion of the front yard or more than thirty (30) percent of the rear yard. It cannot be located within three (3) feet of the side or rear lot line and no closer than ten (10) feet to the principal building.

Is a permit required for an accessory building (storage shed)?

bldg_insp_menu.gif
Accessory buildings over 120 square feet require a permit. If the accessory building is 120 square feet or less, it does not require a permit. Although a permit is not required for buildings 120 square feet or smaller, they must not be placed in an easement and must meet set-back requirements. For more information on accessory buildings requirements, Accessory Building Information.

When do I need an inspection for my building project?

Township of Guelph/Eramosa - Frequently Asked Questions
Building inspections are required before covering any aspect of construction. Specific types of inspections are outlined in the Ontario Building Code. Please call 856-9596 ext 126 to determine if an inspection is required and to arrange an inspection.

When I need a permit, whom do I call for an inspection?

Call the Fire Prevention Division. 271-4623 or 271-4604 to arrange a time for a Fire Inspector to come out and inspect.

I'm just building an accessory building do I still need all the Permits?

Permits FAQs
Development Permit and a Building Permit are required for the construction of accessory buildings exceeding 10 square metres. A Building Permit may not be required for accessory buildings less than 20 square metres used for cold storage if verification is provided showing that the building will not be insulated, heated, or have electrical power.

I want to add a fence, deck, accessory building. How do I get a permit?

Frequently Asked Questions (FAQ) - City of Johnston, Iowa
The Building Permit Technician can be reached buildingdepartment@ci.johnston.ia.us or at 515-727-7778 to obtain a permit and building regulations.
More Questions >>

© Copyright 2007-2012 QueryCAT
About • Webmasters • Contact