QueryCAT Logo
Search 5,000,000+ questions and answers.

Frequently Asked Questions

Do I need to check with DOT for my driveway?

Town FAQ's - Town of Warren Municipal WebSite
Yes, if your property will access a State Road, such as Rt. 90, Rt. 97, Rt. 1, Rt. 131 or a State Aid Road, such as Main St. or Wottons Mill Rd.

Can it be done over my existing driveway, or do I need to replace my driveway?

ISLAND PAVING :: Streetprint :: Residential: FAQS :..
Provided the substrate is in good condition, StreetPrint? can be applied as an overlay to existing concrete, asphalt, or stone base. If the existing driveway is asphalt, in good condition, the pavement can be reheated and StreetPrint? can be applied.

I want to put in a new driveway. What do I need to do?

FAQ's
Complete an Entrance Application form, which is available at the County Engineer's office, 1400 West 6th St., Carroll, Iowa. The application form must be signed by the landowner and indicate where the entrance will be built. The landowner will then need to mark the location of the proposed entrance and the Engineer will examine the site to determine the necessary size entrance pipe.

Do I need to get a permit to put in a new driveway?

Road Commission for Montcalm County (Frequently Asked Questi...
Normally the answer is yes; however, it is always advisable to contact our office and your township zoning board. Anytime a person or business does any construction work in the road right-of-way (normally 66 feet - 33 feet each direction from the center of the road) the should obtain a permit. The townships pay for the application of chloride on local roads in their township, and each township contracts with the Road Commission to take care of this.

When do I need a driveway permit?

Frequently Asked Questions
A Driveway Permit is issued when you are doing an asphalt overlay of your drive, or a removal and replacement with either asphalt, concrete or pavers. A permit is not required for seal-coating. A Site Work Permit form can be mailed to you or is available at the Village Hall. The Village requires a copy of your proposal describing the work to be done. If you are changing the shape of the drive, a Plat of Survey is required showing both the existing drive and the proposed drive.

How many pails of sealer do I need for my driveway?

Latex-ite FAQ: It's easy and important to seal and maintain ...
COVERAGE - The application rate of driveway sealers and resurfacers is important. If you don't use enough, you've left untreated areas of the driveway. If you use too much, the sealer will never "set up" and it the excess will track into your home. It is recommended that you spread a thin layer of sealer, let it cure, and apply a second coat only if necessary. Coverage rates will vary by sealer and by the condition of your driveway.

How many curb ramps do I need to do my driveway?

Shercom Industries Inc. - Product FAQ's
Depending on how wide your driveway is, you will typically need between 2 and 5 ramps. Two ramps for a single car driveway, and as many as 5 for double or small triple driveway.

What if I need to park on the street as I do not have a driveway?

City of Toronto: Transportation Services - Parking
Some streets in the Scarborough District are candidates for the installation of long duration (maximum 12-hours) parking. The policy regarding installing long duration parking dictates the following: Off-street parking must be non-existent or deficient, based on the number of driveways versus the number of homes and in accordance with zoning requirements for parking. (ie. at least one off-street space per home) Long term parking periods will apply to one side of the street only.

Does anyone need to be there when you seal our driveway?

Ottawa Driveway Sealing :: Frequently Asked Questions
No one needs to be home for us to sealcoat your driveway. We do offer seven days a week sealcoating for your convenience. If you're not home, we'll make arrangements with you for payment collection.

Why do I need the 'dot Net' framework?

PicSkinner Freehand - FAQ Tips and Tricks
Microsoft's '.Net' framework is the most up-to-date way for software to work with the Windows operating system. It provides ways of managing the application software that improve stability and security. PicSkinner has been written to use the framework so that you will get these benefits. You can get the Dot Net Framework via Windows Update, or download directly from the Microsoft Developer Network

Do I need a DOT number?

State Police: Commercial Vehicles: FAQ
has a gross vehicle weight rating or gross combination weight rating or gross vehicle weight or gross combination weight of 10,001 lbs whichever is greater or is designed or used to transport more than 15 passengers, including the driver and is not used to transport passengers for compensation or is a bus for hire that has been issued a Permit for Operation of Motorcoach Intrastate Carrier by the Bureau of Motor Vehicles

Can a DOT form be used for Non-DOT tests? What about a Non-DOT form for a DOT test?

Breath Alcohol Detection Links & Frequently Asked Questions
The DOT Alcohol Testing Form (ATF) includes a statement notifying the employee that the test is being conducted under the authority of DOT regulations. For this reason DOT states, "Employers are not permitted to use the 'DOT form' for a test not conducted under DOT authority". DOT employers are subject to audit by the DOT mode they fall under.

Do I need a permit to extend or re-do my driveway?

Marlboro Township - Engineering Division FAQ
application for a Zoning Permit is required to extend or re-do your driveway. A sketch of the driveway with dimensions should be included with the application. The Zoning Department will check for lot coverage and setbacks. The Engineering Division will then review grading, sight distances, tree removal, and other impacts of the driveway addition. Approval of the addition will shall be given if no adverse impacts with respect to the above are anticipated.

Do I need a permit to replace my driveway?

Lawrence Township - FAQ
No, as long as the driveway is not enlarged in any direction. If you plan to enlarge your driveway, please contact the Engineering Department regarding requirements. Minimum driveway setback is five feet (5'). If there are no other outstanding engineering issues (such as submission of an updated as-built plan, re-grading, etc.) except establishment of permanent vegetative cover, you may sign a waiver releasing the developer and Township from all responsibility for grass growth.

I am pouring a driveway, do I need a permit?

City of Gulf Breeze, FL - Department of Community Services
Driveways do not require a permit; however, the City asks that you common sense when pouring them. Never pour a driveway so that it drains water off onto the adjacent property owner.

Do I need a permit for a driveway apron?

General Frequently Asked Questions - Zoning
Yes, a driveway permit for the apron is required for properties located on County-maintained roads. The cost for residential is $25. The cost for commercial is $60. The minimum setback (residential) from a side property line is 4 feet. You will need to go to the Zoning Division to be sure your driveway meets the required set backs; and then to the Building Services Division for the apron.
More Questions >>

© Copyright 2007-2012 QueryCAT
About • Webmasters • Contact