QueryCAT Logo
Search 5,000,000+ questions and answers.

Frequently Asked Questions

What are the applicable building setback requirements?

Stonegate Farms - Frequently Asked Questions.
A 50 foot undisturbed buffer will be required along all sides and rear lot lines. See Article VI of the CC&R's for specific building setback requirements.

What are the setback requirements for my building project?

City of Riverton
You can view the setback requirements at the On-Line link under Title 17 Zoning, Section 17.16.070 by clicking here or you can contact the Community Development Department at (307) 857-7710 for determining the setback requirements as they vary, depending on the zone of your property.

What are my setback requirements?

Snohomish County : PDS : Property Information FAQs
First, determine your property's zoning. Then, go to Title 30 SCC which contains a table (matrix) called "Bulk Matrix" (SCC 30.23.030(1)). The bulk matrix shows the following information for each zoning designation: Associated reference notes for the bulk matrix are found in SCC 30.23.040. We highly recommend that you read these notes to learn of further "restrictions" on each particular zone.

What are the setback requirements for swimming pools?

Frequently Asked Questions, Cascade Township, Michigan (MI)
Swimming pools must be located in the side or rear yard. A ten-foot setback must be maintained between any side or rear property line and the water's edge. A barrier in compliance with the State Building code must surround all swimming pools.

What are my setback requirements for an addition to my home?

Frequently Asked Questions
The Planning Division maintains a map that shows zoning for every parcel in the City. The map can be viewed at the Planning web page or at the Planning Services Counter, or anyone can call 973-2560 to speak with a planner regarding specific zoning, setback, and related questions. Typical minimum setbacks in single family neighborhoods are: 5 to 10 feet for side setbacks, 20 feet for front setbacks, and 15 feet for rear setbacks.

What are the setback requirements for my pool from my house?

FAQ - Pool Engineering, Inc.
Setback requirements for pools will vary depending on your city or county building department. You should check with your building department for further details on swimming pool setbacks. Standard Plans | Custom Engineering | Design & Consulting | Plan, Check & Inspection | How to Order Plans

How do I determine setback requirements?

Planning Department determines allowable setbacks from property lines to structures. If a setback variance is needed, the Fire Department and Building Department may have special conditions applied to the construction of proposed structure.

What is the zoning of my property, and what are the yard/setback requirements?

City of San Pablo - Planning Division FAQs
The Planning Division maintains a map that shows zoning for every parcel in the City. The map can be viewed in the Planning Division lobby, or anyone can call 215-3034 to speak with a planner regarding specific zoning, setback, and related questions. Typical minimum setbacks in single family neighborhoods are 20 feet for front setbacks, 15 feet for rear setbacks, and side setbacks may vary from 3-6 feet.

What are residential setback requirements?

Community Development FAQ, City of Novi, Michigan (MI)
Setbacks are based on the City's Zoning Ordinance, Article 24 Schedule of Regulations. The setbacks will depend on your zoning district. Please contact the Building Department for details.

What is a setback?

Frequently Asked Questions
A setback is a required amount of area between the property line and where items may be located, i.e. sheds, RVs, etc. Setbacks vary according to the particular zoning of the property. Yes.

Why do I have to comply with a building setback line in order to build a structure?

City of Highland, IL - Frequently Asked Questions
The setback lines are required as a portion of the zoning code adopted by the city in 1968. This code helps prevent overcrowding, provides for air and open space, allows for minimal privacy, and lessens the risk of fire. The city has an exclusive contract with a waste management company for dumpster services, including construction dumpsters. You will need to order the dumpster through City Hall, (618) 654 - 9891.

What are the building pre-requirements?

Frequently Asked Questions
General C development environment with bash, gcc, make, etc on a linux machine is required. We are supporting gcc of series 3 and 4. Adjust Makefile variables to point to the openssl headers and libraries. To specify an openssl development directory with include files (e.g. crypto.h), export environment variable OPENSSLDIR with the value of that directory. Another known issue is libidn.so, which means, that some linux distributions do have some libidn.so.11, but not libidn.so.

What other fees are applicable besides the Building Inspection fees?

My Nevada County - Building - Building FAQ's
You'll pay a Plan Check fee when you submit your documents. You'll also pay fees for Environmental Health, Roads, Schools, Parks & Recreation, and Fire (if you live in an area served by a Fire District).

Is there a special building and street setback line established for my property?

City of San Luis Obispo - Public Works Department Frequently...
Certain major streets have been scheduled for future widening to accommodate anticipated traffic demands. Therefore, building "setback lines" have been established to preclude construction of new buildings "within the setback areas" and to secure the required dedications of right of way. You may contact the Public Works Department at 781-7200 or stop by the office at 955 Morro Street to find out if your property is affected.

What requirements are applicable to PMCPs?

FAQ
Non-business PMCPs are exempt from all recordkeeping requirements of Parts 390, 395, and 396. Both groups are exempt from certain sections of Part 391 (see 391.68 and 391.69). PMCPs are exempt from the fuel system requirements of Part 393.67, provided the vehicle fuel system is maintained to the original manufacturer's standard.

To whom are Issuances applicable?

NCS | National Communications System | Frequently Asked Ques...
Directives, Circular, and Manuals are considered binding on the Executive Agent, NCS; Manager, NCS; NCS Committee of Principals and member organizations; and other affected Executive entities. Handbooks and Notices are considered non-binding. They are not required to be submitted for a formal approval and therefore are not considered binding.

Is the Building Use Table applicable to conserved buildings?

Development Control Matters
The Building Use Table is applicable to conserved building for which the approved use are in line with the 2003 Master Plan zoning, except for conserved buildings located within the Historic Conservation Districts i.e. Telok Ayer, Kampong Glam and Little India. Applicants have to pay a processing fee of $800 (subject to GST). The processing fee, based on cost recovery, is the average cost per application which includes manpower costs, appeals, site inspections and other administrative costs.

What is Heating setback?

Domotique Secant Home Automation
Cardio can lower the temperature when receiving such commands from a scene (ex: Exit) or a schedule and turn it back to normal after receiving other direct or programmed instructions. In comfort mode, temperature in each zone is that set individually at each zone thermostat.
More Questions >>

© Copyright 2007-2012 QueryCAT
About • Webmasters • Contact