QueryCAT Logo
Search 5,000,000+ questions and answers.

Frequently Asked Questions

What if I have a permit and do not call for inspections?

Building and Zoning, Frequently Asked Questions FAQ's - City...
Permits expire after 180 days if no required inspections have been approved. In order for a project to be complete, it must pass final inspections. In some cases, a Certificate of Completion or a Certificate of Occupancy may also be required. If a permit expires before final inspections, it becomes null and void, and the project is in violation of the Code. If this is your case, please call our office, we'll help you activate the permit with as little inconvenience as possible.

What about inspections?

FREQUENTLY ASKED QUESTIONS
Inspections are routinely conducted every 3 years. An inspection is not required prior to initial use of the x-ray machine, although an initial inspection is usually conducted within 3 ? 4 months of installation. Inspections are unannounced and usually take 30 minutes to an hour. The inspection is based primarily on radiation safety aspects of your operation of the x-ray equipment.

When do I need to call for inspections after my permit has been issued?

City of Petaluma, Community Development Department
The required inspections are listed on your copy of the permit. All work must be inspected before it is covered up. For example, we must inspect the footing/foundation after it is excavated; installation of steel reinforcement, before concrete is poured. A minimum of twenty-four hours notice is required prior to each inspection.Inspections can be requested by calling 707.778.4479. Yes, dry rot repair does require a permit.

After I obtain a permit how do I get inspections?

Pima County Development Services - Permits - Frequently Aske...
When the permit was issued you received a “buff” colored card that lists the inspections your project requires. The telephone number for inspections (520-740-6970) is on the card. If you call one day before 3:30 p.m. your inspection will usually be done the following working day. The inspectors guarantee two working days in case they have a very heavy schedule.

How will inspections be handled?

City of Bedford: Gas Drilling Frequently Asked Questions
The drilling sites will be inspected by the city. This service can be contracted out and all of the cost of the inspections will be paid for through inspection fees.

How many inspections have you done?

FAQ - Frequently Asked Questions - Home Sweet Home Inspectio...
a builder I was performing inspections prior to any renovations. As an inspector I have over 2,500 inspections in my log.

Do I have to call in for inspections?

GreenWay Fine Decks - FAQ's
No, this is the responsibility of the contractor. Your permit papers will be taped in front of the house visible for the inspectors from the road. Do not remove these papers till after the final inspections are done.

What inspections are recommended for KOMeter??

Frequently Asked Questions (FAQ)
Yearly (and/or 100 hour) inspections should include a check of the sensor access hole for cleanliness. Also check that the right-most decimal point LED (Light Emitting Diode) is OFF. If the right-most decimal point LED is ON, the unit should be replaced. Contact Us for service.

How do I call in septic inspections?

Elkhart County Health Department : Environmental Health Serv...
Septic inspections may be called in to our office Monday through Friday, between 8:00 a.m. and 10:00 a.m. All inspection requests received during this period will be inspected that same day. Please provide the permit number and a phone number where you can be reached and an approximate time the system will be ready for inspection. Inspections are worked into an efficiency schedule for each Environmentalist.

Who will perform the inspections of shops, schools, and other facilities?

Cosmetology Frequently Asked Questions
Inspections will be performed by inspectors in TDLR’s Compliance Division. To ensure that TDLR has the necessary knowledge and expertise to perform effective inspections, the agency is interviewing current cosmetology inspectors and will implement an extensive cross-training program for its existing inspectors. The agency’s goal is to implement a firm, fair and consistent inspection process with greater coverage statewide.

Will I be notified before any inspections?

RnR Real Estate Marketing - Frequently Asked Questions
All states have different notification rules and regulations, and RNR strictly abides by those guidelines. We will enter apartments as needed under emergency situations (water running from an open faucet into another person's apartment or something similar); at the invitation of a lessee including those in the process of vacating their apartment; or with proper notice.

What inspections are required?

Planning: Frequently Asked Questions (FAQs)
Because construction projects vary greatly as to their type and scope, no one set of guidelines can offer in-depth detail of the inspection process for all projects. A basic room addition requires footing, foundation, rough-in, insulation, and final inspections, respectively. Details of the required components for each of these inspections are listed in the NC State Building Codes.
More Questions >>

© Copyright 2007-2012 QueryCAT
About • Webmasters • Contact